Do Landlords Have to Provide Receipts for Repairs in the UK?

Updated: 3 days ago
In most private tenancies, a landlord has no general legal duty to hand a tenant a receipt for every repair. But “usually no” has important exceptions. If you manage a leasehold block, a tenant asks to see service charge invoices. If you deduct from a deposit, you need evidence. If HMRC asks, you need records. So the practical answer is: you may not have to give receipts out, but you do need to keep them and be able to produce them quickly.
This is general information, not legal advice.

When receipts or supporting documents are required
Service charges in leasehold blocks. Leaseholders can ask in writing for a summary of the costs behind their service charge under section 21 of the Landlord and Tenant Act 1985. They can then ask to inspect the accounts, receipts and other supporting documents under section 22. Managing agents and RTM/RMC companies often receive these requests, so repair invoices need to be easy to find.
Deposit deductions. If you want to deduct repair costs from a tenancy deposit, you will usually need to show the work was needed, what it cost, and that it goes beyond fair wear and tear. Photos, check-in and check-out reports and invoices or quotes all help.
Tenant-paid emergency repairs. If your tenancy agreement allows a tenant to arrange an urgent repair and claim the cost back, expect to reimburse against a receipt. Check what your agreement says, and make sure tenants know to keep receipts.
Tax records. Landlords need records of rental income and expenses to support what they claim, including repair and maintenance invoices. HMRC guidance on keeping records says at least five years after the 31 January submission deadline for the relevant tax year. From April 2026, landlords with qualifying property income over £50,000 must also keep digital records under Making Tax Digital for Income Tax.
When a receipt isn’t strictly required
For a routine repair in a standard private tenancy, such as a plumber fixing a tap, the tenant generally has no legal right to the invoice. What they do need is clear communication: that the repair was reported, who is attending, and when it was finished. Many disputes are not really about paperwork. They come from tenants who report a problem and then hear nothing.
Sharing a brief summary (“the leak under the kitchen sink was repaired on Tuesday by our contractor”) costs you nothing and prevents a lot of chasing. For the landlord’s repair duties themselves, see our guide to legal requirements for landlord property repairs.
What a good repair record looks like
A receipt on its own is a weak record. Six months later, nobody remembers which flat it was for. A complete record for each job includes:
The original report: date, who reported it, and how.
The instruction: which contractor was asked, when, and any approval given for the cost.
The invoice or receipt: matched to the property, unit and job.
Before and after photos, where practical.
The close-out: the date the tenant or resident was told it was complete.
If you already use automated repair requests, most of this is captured as the job moves along. If not, a shared folder per property with a consistent file-naming habit (property, date, job type) goes a long way.
An example of how it goes wrong
Say a leaseholder in a small block asks to see the invoices behind a roof repair charge. The managing agent knows the work happened, but the invoice is in a former colleague’s inbox, and the contractor has since changed their email address. Days are lost reconstructing paperwork that should have been filed when the job closed. Nothing illegal has happened yet, but the agent is now exposed to complaints and a frustrated resident. This is a hypothetical, but anyone who has worked in block management will recognise it.
How long to keep repair records
For tax, follow HMRC’s guidance above. For practical purposes, many managing agents keep repair and invoice records for longer than the minimum, especially for blocks, because disputes can surface well after the work is done. Keep records longer for anything connected to a sale, a major works project or a disagreement. If a person’s data is involved, such as names, addresses or contact details on a job record, also consider your data protection obligations.
A simple routine that keeps you covered
Create a job record at the moment the repair is reported.
Get invoices sent to a shared inbox, not an individual’s.
Match each invoice to the job and property within a week of receiving it.
Chase missing invoices as part of month-end. Our managing contractor relationships guide covers how to set this expectation up front.
Check your maintenance budget against paid invoices each month.
Back up records digitally. Scanned copies are generally acceptable for tax purposes, provided they are legible.
Common mistakes
Keeping receipts only in email. Staff leave, mailboxes change and invoices get lost.
No link between invoice and job. A receipt for “labour and materials” with no address is hard to defend.
Waiting until a dispute to gather paperwork. It is much harder to reconstruct a record than to keep one.
Treating repairs and improvements the same. HMRC treats them differently, so record what the work actually was.
Where ProLink can help
Keeping repair records tidy is exactly the kind of admin that slips when a team is stretched. ProLink Property Support helps managing agents, landlords and RTM/RMC companies coordinate maintenance, track contractor invoices and keep property files organised, so the paperwork is ready when someone asks for it. If you’d like to talk through how that could work for your portfolio, use the Book a Call page.
This article is general information, not legal advice. Check the official sources for your situation.





Comments